Navigate home logo

Here you will find information about minor building applications and how to submit them.

What is a minor application?

A minor application is required for any improvement or construction to a property which is not attached or located under the main roof and that requires a building license to be issued from the local authority.

When do I need to submit one?

We require an application for the following types of structures:

  • below-ground pool
  • non-demountable above ground pool
  • retaining wall greater than 1.2m high
  • masonry structure (i.e. brick or stone) greater than 1.8m high
  • shed greater than 42 square metres.

We do not require an application for:

  • aviaries
  • a gazebo
  • lightweight carport not under the main roof
  • lightweight shed less than 42 square metres
  • ornamental pond
  • pergola/patio
  • retaining wall less than 1.2m high
  • shade sails
  • single leaf garden wall and fences up to 1.8m high
  • water feature less than 1.8m high
  • above ground spa.

Before submitting your application

  1. Obtain plans from Before You Dig Australia
  2. Determine the location of the sewer main nearest to your proposed building.
  3. Determine the material type and depth of the sewer main nearest to your proposed building.
  4. Read the Residential guidelines for designers document.
  5. Self assess your design in conjunction with our requirements.

How to submit your application

You can use our self-service system BuilderNet to lodge your application. If you are not a regular BuilderNet user, you can use our Guest Account option to log in.

  1. Login to BuilderNet and lodge a 'Minor plan application'.
  2. Attach an electronic copy of your site plans and any other documents relevant to your application, in PDF or JPG format (less than 10MB in size).
  3. We will email your invoice, outlining the application fees. You will need to pay these fees before your application is approved.

Lodge your application

How much do I need to pay?

The fee for a minor plan application is as follows:

 
  2024-25
Minor plan fee $113.74

Your application may take up to 10 working days to be assessed and the appropriate fee will be determined by our Building Services section.

Note: Any application that involves an extension to the main roof, or is under the main roof is classified as an addition/alteration application.

An invoice will be generated and payment options will be provided on the back of your account.

More information

Please complete our enquiry form if you require further information.

LODGE AN ENQUIRY